Search This Supplers Products:Cat litterTofu cat litterBentonite cat litterPaper cat litterPet productsPet kit
For the existing package bags, 1 week for one 20ft container (25Tons). For New OEM brands, it takes 3 weeks to produce the new bags, and the total leading time would be 4 weeks. For repeated OEM brands, the leading time would be 1-2 weeks.
网络文化经营许可证:浙网文[2013]0268-027号|增值电信业务经营许可证:浙B2-20080224-1 2007-2024 Tradevv.com. All rights reserved.